Mean calculations and interpretation:
A fabric manufacturing plant tracks the meters of fabric produced each loom day for a week, recording the following amounts (in meters): 120, 135, 140, 150, 155.
165 1) calculate the mean production per day 2) if one loom significantly under at 60 meters on a specific day how would this affect the mean? 3) explain why the mean might not always accurately represent a typical production level in causes of wmvarianility?
quanswer.com